[1]
Ling, Z. and Chen, Y. 2025. Research on Multi-Objective Optimization of Project Scheduling based on NSGA-III: Trade-off among Project Duration, Resource Allocation, and Robustness. International Core Journal of Engineering. 11, 4 (Mar. 2025), 413–422. DOI:https://doi.org/10.6919/ICJE.202504_11(4).0049.