Difficulties and Countermeasures of BIM Forward Design

Authors

  • Churan Yuan

DOI:

https://doi.org/10.54691/sjt.v4i8.1643

Keywords:

BIM; Forward Design; Implementation Difficulties.

Abstract

BIM (Building Information Modeling) technology has greatly promoted the development of construction engineering in recent years. The shift from traditional reverse design to positive design is an inevitable trend for the continuous improvement and development of BIM technology. However, the implementation of BIM forward technology is difficult. This paper combs the implementation difficulties of BIM forward design, and summarizes the corresponding countermeasures.

Downloads

Download data is not yet available.

References

H. Y. Yan: Residential facilities in China, Vol. 21 (2022) No. 5, p. 60-62.

X. Y. Cui, Y. C. Chen, F. Z. Tang, J. X. Tang, J. J. Xia: 2021 National Civil Engineering Construction Technology Exchange Proceedings (Volume II), Vol. 3 (2021) No. 3, p. 323-325.

C. Ding: Sichuan Building Materials, Vol. 28 (2021) No. 4, p. 46-47.

Downloads

Published

2022-08-20

Issue

Section

Articles

How to Cite

Yuan, C. (2022). Difficulties and Countermeasures of BIM Forward Design. Scientific Journal of Technology, 4(8), 19-22. https://doi.org/10.54691/sjt.v4i8.1643