Difficulties and Countermeasures of BIM Forward Design
DOI:
https://doi.org/10.54691/sjt.v4i8.1643Keywords:
BIM; Forward Design; Implementation Difficulties.Abstract
BIM (Building Information Modeling) technology has greatly promoted the development of construction engineering in recent years. The shift from traditional reverse design to positive design is an inevitable trend for the continuous improvement and development of BIM technology. However, the implementation of BIM forward technology is difficult. This paper combs the implementation difficulties of BIM forward design, and summarizes the corresponding countermeasures.
Downloads
References
H. Y. Yan: Residential facilities in China, Vol. 21 (2022) No. 5, p. 60-62.
X. Y. Cui, Y. C. Chen, F. Z. Tang, J. X. Tang, J. J. Xia: 2021 National Civil Engineering Construction Technology Exchange Proceedings (Volume II), Vol. 3 (2021) No. 3, p. 323-325.
C. Ding: Sichuan Building Materials, Vol. 28 (2021) No. 4, p. 46-47.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.




