Analysis of the Construction of Employment Evaluation System for Higher Vocational Students based on AHP Model
DOI:
https://doi.org/10.6981/FEM.202407_5(7).0004Keywords:
AHP Model; Higher Vocational Students; Employment Evaluation System.Abstract
This article deeply and comprehensively explores the construction issues of the employment evaluation system for higher vocational students based on the Analytic Hierarchy Process (AHP) model. It elaborates in detail the principles of the AHP model and the remarkable advantages it has in application in this field. On this basis, it further analyzes in detail a series of key indicators of the employment evaluation of higher vocational students, including many important aspects such as professional skills, comprehensive qualities, and practical experience. Through carefully constructing such an employment evaluation system, it is able to comprehensively assess the actual employment situation of higher vocational students in a more scientific and accurate way. This can not only provide extremely valuable and strong basis for the improvement of higher vocational education in terms of teaching content and training methods, but also provide important references for students to plan their own career development paths. At the same time, it also conducts in-depth analysis of various challenges faced in the process of system construction, such as the improvement of the indicator system and the accurate acquisition of data. In response to these challenges, a series of corresponding solutions are put forward, such as continuously optimizing indicators and strengthening data management, etc., and its purpose is to vigorously promote the employment evaluation work of higher vocational students to continuously develop in a more complete and efficient direction.
Downloads
References
Wang Xian. Research on the Blended Teaching Quality Evaluation of Newly-built Applied Undergraduate Colleges Based on the AHP-FCE Model - Taking Yuncheng University as an Example [J]. Foreign Economic Relations and Trade, 2024, (05): 89-93.
Zhang Xiaofeng, Shi Yongjie, Liu Jun, et al. Multi-objective Optimization of the Live Water Scheduling Scheme in the West Bank of Wangyu River Polder Area Based on the AHP-Entropy Weight Method [J]. Advances in Water Resources Science and Technology, 2024, 44 (03): 80-87.
Shao Hedong. HSE Management Evaluation of General Contracting of Mining and Metallurgical Engineering with Hybrid Improved AHP [J]. Mining and Metallurgy, 2024, 33 (02): 203-209.
Zhang Zheqi, Chang Qinxiang. Research on the Cooperative Learning Evaluation Model of the Applied Undergraduate Landscape Architecture Major Based on the OBE Concept [J]. Anhui Agricultural Science Bulletin, 2024, 30 (07): 113-117.
Liu Jing, Sun Yuhe, Zhang Zhengdong, et al. Research on the University Public Opinion Early Warning Method Based on the AHP-TOPSIS Method [J]. Big Data Era, 2024, (03): 27-30.
Li Na. Higher Vocational Professional Evaluation from the Perspective of Ecosystem Theory and Its Impact on Career Choice [J]. Journal of Hubei Adult Education Institute, 2016, 22 (04): 15-19.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Frontiers in Economics and Management

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.



