Research on the Mechanism Motion and Structural Stiffness of Shield Segment Erector
DOI:
https://doi.org/10.6919/ICJE.202411_10(11).0005Keywords:
Segment Erector; Loading Conditions; Simply Supported Beam Model; Stiffness Analysis.Abstract
To validate whether the load characteristics of the shield segment erector meet the design specifications, this study conducted a detailed analysis of torque requirements under four typical working conditions. First, focusing on the functional requirements and operational behavior of the erector, a detailed 3D model was created using 3D design software. Next, the erector’s structure was simplified, with its load-bearing conditions approximated by a simply supported beam model, leading to the derivation of corresponding torque calculation formulas and the computation of the required design torque values. Finally, static structural analysis of the erector’s stiffness under four load scenarios was carried out using ANSYS software. The results revealed that under the maximum load condition, the erector experienced a maximum stress of 213.74 MPa and a maximum displacement of 1.6 mm, both of which are within the safe range and meet the structural strength requirements.
Downloads
References
[1] Jia Lianhui, Li Taiyun. Key technologies for ultra large diameter shield tunnel segment assembly machine [J]. Journal of Zhejiang University (Engineering Edition), 2020, 54 (04): 816-823.( In Chinese).
[2] Member Wu, Deng Bin, Wang Taoyong, et al. Automatic assembly method of shield tunnel segments based on line laser sensors [J]. Infrared and Laser Engineering, 2024, 53 (08): 75-87. (In Chinese).
[3] Hu Yanwei, Jia Lianhui, Li Ming. Development and application of horseshoe shaped shield tunnel segment assembly machine [J]. Tunnel Construction (Chinese and English), 2023, 43 (02): 327-333. (In Chinese).
[4] Song Changbing. Optimization of translation mechanism design for pipe segment assembly machine [J]. Construction Machinery, 2022, (03): 76-78. DOI: 10.14189/j.cnki. cm 1981.2022.03.012. (In Chinese).
[5] Liu Feixiang. Research on the Intelligent Grasping and Assembly of Pipe Segment Assembling Machines [J]. Railway Construction, 2020, 60 (08): 58-63. (In Chinese).
[6] Xia Yimin, Hu Xinghuai, Mei Yongbing, et al. Mechanical properties of the choke frame for the assembly of a Φ 6.28m shield tunnel segment [J]. Mechanical Design and Research, 2012, 28 (06): 118-120+123. DOI: 10.13952/j.cnki. jofmdr. 2012.06.030. (In Chinese).
[7] Wang Daozhi, Min Rui, Yuan Xianghua, et al. Dynamic analysis of fine adjustment mechanism for shield tunnel segment assembly [J]. Journal of Tongji University (Natural Science Edition), 2024, 52 (06): 953-961. (In Chinese).
[8] Yuan Y C, Zhang Y. Building of fine-tuning mechanism posture and kinematics model for shield segment erector[J]. Advanced materials research, 2013, 634: 3737-3740.
[9] Duhme R, Rasanavaneethan R, Pakianathan L, et al. Theoretical basis of slurry shield excavation management systems[J]. Tunnelling and underground space technology, 2016, 57: 211-224.
[10] Duhme R, Rasanavaneethan R, Pakianathan L, et al. Theoretical basis of slurry shield excavation management systems[J]. Tunnelling and underground space technology, 2016, 57: 211-224.
[11] Li Suiting, Xie Xiaopeng, Zong Weiqi, et al. Vibration and Friction Analysis of Shield Tunnel Tube Assembling Machine [J]. Lubrication and Sealing, 2019,44 (02): 114-117+132. (In Chinese).
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.