Keywords:

GMP Pharmaceutical Factory; Standardized Maintenance; Fuzzy Comprehensive Evaluation(FCE) Method; Analytical Hierarchy Process (AHP); Practice Verification.

Abstract

It is an inevitable trend to establish standardized maintenance system based on GMP. In order to promote the standardization construction of equipment maintenance, a pharmaceutical factory introduced a standard method to solve problems. The method consists of five standard stages for the analysis and repair of faulty equipment. In order to confirm whether to start standardized maintenance procedures, fuzzy evaluation model and hierarchical analysis process are used to transform multiple fuzzy factors into quantitative indicators, and calculate the weight of quantitative indicators, when obtaining satisfactory consistency through consistency check, scientific and reasonable decision-making can be used to verify the reliability of maintenance decisions. The practice of factory case verification proves that the model can meet the decision requirements and can be used as the basis for decision making.

Downloads

Download data is not yet available.

References

[1] Yang Qing. Research on Application of RCM in Substation Equipment Maintenance[D], Kunming University of Science and Technology, 2007.

[2] Guan Xiaojing, Wang Zhiguo. Fuzzy Comprehensive Evaluation Method for Performance Analysis of Large Chemical Plant[J].Chemical Engineering & Machinery,2003,(03):160-163.

[3] Xu Shubo. Practical Decision Method: Analytic Hierarchy Theory[M]. Tianjin University Press, 1988.

[4] Xie Jing, Shu Hongchun, Wang Ke, etc,. State Evaluation Algorithm of High Voltage Switch Cabinet Based on Fuzzy Layering Theory[J]. High Voltage Engineering, 2014,40(10):3186-3192.

[5] Cao Jingwen.Research on e-Learning Systematic Evaluation System of DST Corporation[D]. Dalian University of Technology,2017.

[6] Jin Cong, Feng Jie. Application of Fuzzy Comprehensive Evaluation Model in Medical Equipment Configuration Management[J]. China Medical Equipment,2018,15(05):109-112.

[7] Zhou Lian, Liu Shunli, Huang Saichao, etc,. The Application of AHP Algorithm in Determining Critical Target of Shield[J]. Ordnance Industry Automation,2007,(02):8-10.

[8] Jin Qiaohua, Wang Yonggang, Jia Zhixiang. Analytic Hierarchy Process and Its Application in Talent Recruitment[J].Computer and Modernization,2011,(08):190-192.

[9] Zhang Min, Xu Xueping, Lu Dongsheng, etc,. Medical Equipment Maintenance Decision Based on Fuzzy Comprehensive Evaluation Method[J]. China Medical Equipment,2020,17(03):42-45.

Downloads

Published

2024-11-19

Issue

Section

Articles

How to Cite

Yuan, Zhuoran. 2024. “Construction of Equipment Standardized Maintenance System and Practice of Fuzzy Comprehensive Evaluation and Analytical Hierarchy Process in Pharmaceutical Plant”. International Core Journal of Engineering 10 (12): 8-17. https://doi.org/10.6919/ICJE.202412_10(12).0002.