Research on Multi AGV Routing Problem in Electrode Sheet Production Plant Considering Dynamic Unlocking
DOI:
https://doi.org/10.6919/ICJE.202501_11(1).0014Keywords:
Automated Guided Vehicle; Improved A* Algorithm; Routing Problem; Deadlock; Electrode Sheet Workshop.Abstract
This study delves into the problem of path planning for Automated Guided Vehicles (AGVs) in the electrode sheet production plant environment. Firstly, leveraging the grid method, a workshop environment model is constructed. An enhanced A* algorithm is devised, introducing a turning cost and a variable coefficient, effectively addressing issues of excessive path inflection points and lengthy computation times when dealing with large-scale environmental maps.For dynamic conflicts and deadlock issues within the local road network, two algorithms are introduced: the Dynamic Detection Algorithm based on Segment Reservation Policy (DD-SRP) and the Deadlock Resolution Algorithm based on Breadth-First Search (DR-BFS). A simulation experiment is designed and conducted. The experimental results underscore the superiority of the enhanced A* algorithm in terms of solution time and outcomes. Moreover, the proposed dynamic conflict and deadlock detection and resolution methods effectively achieve dynamic detection and deadlock resolution.
Downloads
References
[1] D. D. Yu, X. L. Hu, K. W. Liang, et al. A parallel algorithm for multi-AGV systems, Journal of Ambient Intelligence and Humanized Computing, Vol. 13 (2022) No. 4, p. 2309-2323.
[2] J. B. Xin, L. Q. Wei, A. D'ARIANO, et al. Flexible time-space network formulation and hybrid metaheuristic for conflict-free and energy-efficient path planning of automated guided vehicles, Journal of Cleaner Production, Vol. 398 (2023) No. 2, p. 1-24.
[3] H. Hu, X. Jia, K. Liu, et al. Self-adaptive traffic control model with behavior trees and reinforcement learning for AGV in Industry 4.0, IEEE Transactions on Industrial Informatics, Vol. 17 (2021) No. 12, p. 7968-7979.
[4] B. Wu, Z. Xu, L. Chen, et al. Dynamic path planning for forklift AGV based on smoothing A* and improved DWA hybrid algorithm, Sensors, Vol. 22 (2022) No. 18, p. 7079.
[5] Y. Zhang, H. Luo. Hybrid routing and scheduling for multi-AGV systems in smart manufacturing, Computers & Industrial Engineering, Vol. 178 (2023), p. 108999.
[6] J. Zhang, Z. Li, L. Li, et al. A bi-level cooperative operation approach for AGV based automated valet parking, Transportation Research Part C: Emerging Technologies, Vol. 128 (2021) No. 6, p. 103140.
[7] S. Kim, C. Park, K. Lee. Bi-level path planning algorithm for multi-AGV routing problem, Electronics, Vol. 10 (2021) No. 9, p. 1123.
[8] D. M. RYCK, M. VERSTEYHE, F. DEBROUWERE. Automated guided vehicle systems, state-of-the-art control algorithms and techniques, Journal of Manufacturing Systems, Vol. 54 (2020), p. 152-173.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.



