Collaborative Management of Quality, Schedule, and Cost in Low-Altitude Economic Infrastructure Construction Projects
DOI:
https://doi.org/10.54691/41fvcg93Keywords:
Low-Altitude Economy; Infrastructure; Collaborative Management; Quality Control; Schedule Optimization; Cost Control.Abstract
This paper focuses on low-altitude economic infrastructure construction projects, constructs a collaborative management model for quality, schedule, and cost, and conducts case studies. Data analysis of the Jiangbei General Airport and Jiangnan Low-Altitude Communication Network projects reveals that under the traditional management model, the quality inspection pass rates for these two projects were only 82.3% and 79.5%, respectively, with cost overruns of 14.2% and 18.7%. Data simulations demonstrate that the collaborative management model can increase the quality-schedule-cost coupling coefficient to 0.87 and reduce the delay rate at key nodes by over 35%. In case application, the quality pass rate for Case A increased to 98.7%, while cost overruns were reduced to 3.8%. In Case B, communication latency was stabilized at 42ms, and the approval cycle was shortened by 67%. This research demonstrates that the model can effectively address management challenges and provide a scientific management paradigm for low-altitude economic infrastructure construction.
Downloads
References
[1] Zhao, J. High-quality development of low-altitude economy: connotation, characteristics, constraints and breakthrough paths. Contemporary Economic Research, Vol. 356(2024) No. 4, p. 27-42.
[2] Xue, L., Sun, X., & Pan, S. Basic support, key areas and development priorities of my country's low-altitude economy. Journal of Social Sciences, Vol. (2025) No. 2, p. 120-129.
[3] Liao, X., Qu, W., Xu, C., He, H., Wang, J., & Shi, W. A review of research on low-altitude public routes of urban air traffic and its new infrastructure. Acta Aeronautica Sinica, Vol. 44(2023) No. 24, p. 6-34.
[4] Jin, Y., Zhang, H., Deng, Z., Tang, X., Wang, Z., Hu, Y., & Ma, C. Application and prospects of 5G-A/6G+ Beidou inter-sensing technology in low-altitude economy. Telecommunications Science, Vol. 41(2025) No. 3, p. 1-16.
[5] Zheng, Y., & Xu, L. Promoting the construction of China's modern industrial system with the "multi-track" approach of the large-scale science and technology innovation system. Bulletin of the Chinese Academy of Sciences, Vol. 40(2025) No. 5, p. 795-808.
[6] Song, W., Yang, F., Xiang, S., Han, C., Kang, G., & Fan, X. Analysis of the development progress and industrialization prospects of hydrogen-powered aircraft. Chinese Journal of Engineering Science, Vol. 25(2023) No. 5, p. 192-201.
[7] Liu, X., Gao, R., & Wang, B. Analysis of horizontal mergers with hyperbolic demand and cost-free synergy effects. Journal of Shandong Normal University (Natural Science Edition), Vol. 22(2007) No. 3, p. 14-17.
[8] Zhang, Z., Wang, X., Su, C., & Sun, L. Co-evolutionary game of shared manufacturing quality under different cost-benefit allocation mechanisms. Journal of Systems Management, Vol. 33(2024) No. 2, p. 341-355.
[9] Chen, H., Huang, X., & Wang, W. Research on Stackelberg Optimization of Collaborative Innovation of Complex Product Parts Considering Cost Sharing. Chinese Journal of Management Science, Vol. 30(2022) No. 7, p. 69-76.
[10] Ma, B., & Song, Y. Research on Inventory Cost Optimization and Allocation Analysis under Supply Chain Collaboration. Journal of Shanxi Agricultural University (Social Science Edition), Vol. 11(2012) No. 2, p. 160-165.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Scientific Journal of Economics and Management Research

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.