Analysis of the Technical Characteristics of the Construction of Extra-long Tunnels under Complex Geological Conditions in the Event of Large-scale Water Surges and Blasting.

Authors

  • Guitao Yang

DOI:

https://doi.org/10.6919/ICJE.202409_10(9).0013

Keywords:

Basic Transportation; Railroad and Road; Tunnel Construction; Regional Coordinated Development.

Abstract

2012-2022, China's investment ratio in the construction of basic transportation facilities gradually increased, the railroad and highway increased mileage of about 1.1 million kilometers; especially for the central and western regions of the continued investment in infrastructure and transportation, sichuan province as a large inland province in southwest China, "twelfth five-year plan" at the end of the total mileage of ordinary highways in the province amounted to 289,000 kilometers, the Regional development imbalance is prominent, the breadth of the road network is insufficient, the depth is obviously insufficient; ten years, the province through the reconstruction and expansion, now the province's total mileage of ordinary highway more than 390,000 kilometers, ranked first in the country, one year ahead of schedule to complete the goal of transportation out of poverty, "dense road network" aims to strengthen connectivity; do strong hubs, can improve transport efficiency! In addition, it can even promote the economic development of towns and cities, strongly guarantee the stability of economic operation, promote the level of regional coordinated development and continuously improve, but also to support the national strategic ability to continuously increase the basic ballast stone. Sichuan is surrounded by mountains on all sides, with large differences in landforms, complex and varied terrain, located in the transition zone between the first level of the three major terrain gradients of the Chinese mainland, the Tibetan Plateau and the third level of the middle and lower reaches of the Yangtze River Plain, consisting of mountainous terrain, hilly terrain, plains, basins and plateaus. As the saying goes, "the road to Shu is difficult, more difficult than the sky", in order to turn "the road to Shu is difficult" into "the road to Shu is smooth", the builders of the mountains and water bridges, and tunneling is essential to the main event. The construction of tunnels is the most important part of the project.

Downloads

Download data is not yet available.

References

Yu Jiukang, Tong Lei, Yan Jun, et al. Study on risk prediction and treatment measures of water gusher in deep buried long tunnel crossing water-rich fault zone [J/OL]. Water Resources and Hydropower Technology (English and Chinese), 1-9[2024-08-02]. http://kns.cnki.net/kcms/detail/10.1746.TV.2024 0716.0905.002.html.

Xue Mingying. High-speed rail tunnel large mechanized construction of smooth blasting parameters optimization of numerical simulation and experimental study [J]. Journal of construction machinery, 2024, (7) : 210-215. The DOI: 10.14189 / j.carol carroll nki cm1981.2024.07.033.

Xu Jiao. Blasting profile control technology of surrounding rock in Soft rock tunnel [J]. Transportation Science and Management, 2024, 5 (13): 100-102.

Wu Shuo, YAO Bingjin, Chen Bigang, et al. Research on gripping force distribution of surrounding rock in smooth gun hole of tunnel [J]. Modern Mining, 2024, 40 (06): 45-48+53.

Zhao Lipeng, Li Jian, LEI Xiaotian, et al. Study on "L" type ground advance grouting scheme of poor geological section of Xiangrushan Tunnel [J]. Tunnel Construction (Chinese and English), 2024, 44 (06): 1294-1304.

Ren Shifang, YU Tanqiu, ZHANG Xianyu, et al. Application effect of shaped charge water pressure smooth blasting on fractured rock mass in deep buried long tunnel [J]. Basic Engineering Science, 2024, 38 (03): 387-393.

Zhang Piyun, WANG Yundong, XIA Tongmai, et al. Shaped charge blasting test of cut slit charge pack with water interval in hole around tunnel [J]. Modern Mining, 2024, 40 (05): 36-39.

Li Weixing. Application of curtain grouting technology in the treatment of mud and water gushing in Mountain tunnel [J]. Sichuan Cement, 2024, (05): 200-202.

Ren Yuning. Smooth surface blasting construction Technology of crushed surrounding rock in Expressway Tunnel [J]. Science and Technology Innovation, 2024, (09): 139-142.

Research on support and construction technology of large-span tunnel crossing fault fracture zone [J]. Shanxi Architecture, 2024, 50 (03): 158-160. (in Chinese) DOI:10.13719/j.cnki.1009-6825.2024.03.040.

Li Yongzhi, Wang Hua, Wang Shiming, et al. Disaster Mechanism and response Measures of Xinping Tunnel of Yumo Railway [J]. Construction Technology (Chinese and English), 2024, 53 (04): 67-73.

Chen Wenda, LI Yanqiang, HUANG Jiayu. Surface Blasting Technology of shaped charge water pressure in Tunnel crushing surrounding Rock [J]. Transportation World, 2024, (Z1): 261-263. DOI:10.16248/ j.cnki.11-3723/u.2024.z1.086.

Pei Qiaoqiao, SHEN Tiejun. Comparative Analysis of Water Pressure shaped charge smooth Blasting and conventional smooth Blasting in Tunnel [J]. Transportation Technology and Management, 2023, 4 (24): 148-150.

Long Jie, Wu Song, ZHAO Jingren, et al. Analysis of water disaster treatment measures in tunnel near rich water fault [J]. Value Engineering, 2023, 42 (31): 49-51.

Fan Qianwei. Research on treatment technology of water gushing mud in Construction of Long tunnel [J]. Jiangxi Building Materials, 2023, (09): 224-225+228.

Zhi-gang han. Tu mud mountain tunnel water gushing prevention and treatment technology research [J]. Journal of comprehensive utilization of fly ash, 2023, 37 (4) : 31-36 DOI: 10.19860 / j.carol carroll nki issn1005-8249.2023.04.005.

Wu Zhaochi, Gao Yuan, Tao Feng, et al. Practical Technology of shaped charge water pressure smooth Blasting in Tunnel Driving [J]. Railway Engineering Technology and Economics, 2023, 38 (04): 24-29+34.

Li Yongqing. Engineering treatment of high slope on the right bank of Shawan Hydropower Station on Dadu River [J]. Sichuan Water Resources, 2021, 42 (05): 72-75.

Ren Gang. Big cross section in soft rock grouting reinforcement technology research [D]. Taiyuan university of technology, 2020. The DOI: 10.27352 /, dc nki. Gylgu. 2020.000231.

Du Ye, xiang-jun pei, Dr. Huang. When the viscosity cataclastic rock reinforced by modified grouting materials applied research [J]. Journal of engineering geology, 2016, 24 (3) : 369-375. The DOI: 10.13544 / j.carol carroll nki jeg. 2016.03.005.

Pei Xiangjun, Zhang Jiaxing, Wang Wenchen, et al. Study on hydration process and rheological properties of SJP grouting slurry [J]. Chinese Journal of Geotechnical Engineering, 2017, 39 (02): 201-209.

Peng Xiaoqin, LAN Cong, Wang Shuping, et al. Effect of hydrated calcium silicate powder on hydration reaction process and mechanism of cement [J]. Journal of Building Materials, 2015, 18 (02): 195-201.

Kang Haibo, Zhou Chaoyue, Chen Xianguo, et al. Grouting and water blocking technology of large section highway tunnel in water-rich karst stratum [J]. Construction Technique, 2014, 43 (S1): 406-409.

Pei Xiangjun,Huang Runqiu,Li Zhengbing,et al. Study on grouting reinforcement of unloaded cracked and relaxed rock body on the left bank of Jinping first-level hydropower station [J]. Journal of Rock Mechanics and Engineering, 2011, 30 (02): 284-288.

Downloads

Published

2024-08-16

Issue

Section

Articles

How to Cite

Yang, Guitao. 2024. “Analysis of the Technical Characteristics of the Construction of Extra-Long Tunnels under Complex Geological Conditions in the Event of Large-Scale Water Surges and Blasting”. International Core Journal of Engineering 10 (9): 98-110. https://doi.org/10.6919/ICJE.202409_10(9).0013.