Risk Assessment Study of Academic Talent Data Management Platform Development Project

Authors

  • Yifan Qu
  • Xinxin Sun

DOI:

https://doi.org/10.54691/bcpbm.v40i.4356

Keywords:

Risk Management; FMEA Methodology; Risk Identification

Abstract

With the continuous promotion of talent informatization, to improve the talent development index system for social needs and talent growth needs, academic evaluation and talent data management type platforms have gradually emerged and rapidly developed, and have been more widely used. However, there are many risks in the process of developing such emerging data platforms, which seriously affect the final benefit of the project. Therefore, this reaseach take the Global Unified Artifact Distributed Autonomous project as an example and apply the FMEA method for risk identification and risk assessment. The results show that the technical risks are the most serious and the schedule risks are the least serious. At the same time, the paper proposes strategies for optimizing the risk management of software projects to help the projects be carried out correctly and orderly.

Downloads

Download data is not yet available.

References

Zeng Zhaowen. (2015). Exploring the risk identification of educational websites based on project risk management perspective. Invention and Innovation (Education Informatization) (05), 54-58.

Li, D. P.. (2008). An exploration of risk management for software development projects. Science and Technology Information (Academic Research) (09), 542-544+546.

Li, F.. (2021).Research on risk management of the development project of metrology apparatus management platform of DW Food Company. Light Industry Standards and Quality (04), 99-101. doi:10.19541/j.cnki.issn1004-4108.2021.04.022.

Guo J, Wan Xiang, Zhang H, He H & Wang Y. (2021).A study on risk management of software development projects in Company M. Science and Technology Information (09), 141-143+147. doi:10.16661/j.cnki.1672-3791.2103-5042-6012.

Wu, X. Y.. (2014). Risk management for specialized hospital website construction projects. Journal of Medical Informatics (04), 36-39.

Zeng YR & Wang L. (2009). Risk evaluation model for logistics public information platform development. Library and Intelligence Work (20), 127-130.

Saaty, R. (1987). The analytic hierarchy process - what it is and how it is used. Mathematical Modelling, 9(3-5), 161-176. doi: 10.1016/0270-0255(87)90473-8

Jansen, D. (2022). Quantitative Data Analysis Methods & Techniques 101 - Grad Coach. Retrieved 20 September 2022, from https://gradcoach.com/quantitative-data-analysis-methods/

Sackman, H. (1976). The Delphi method. Futures, 8(5), 444-446. doi: 10.1016/0016-3287(76)90011-2

Velez-Pareja, I. (2003). The Delphi Method (El Metodo Delphi). SSRN Electronic Journal. doi: 10.2139/ssrn.420040

Barki, H., & Pinsonneault, A. (2001). minor Group Brainstorming and Idea Quality. minor Group Research, 32(2), 158-205. doi: 10.1177/104649640103200203

PUTMAN, V., & PAULUS, P. (2009). Brainstorming, Brainstorming Rules and Decision Making. The Journal Of Creative Behavior, 43(1), 29-40. doi: 10.1002/j.2162-6057.2009.tb01304.x

Jusuf, H. (2018). THE MODELS OF CHECKLIST METHOD IN EVALUATING ELT TEXTBOOKS. Al-Lisan, 3(2), 17-35. doi: 10.30603/al.v3i2.422

Nisonger, T. (2008). Use of the Checklist Method for Content Evaluation of Full-text Databases. Library Resources &Amp; Technical Services, 52(1), 4-17. doi: 10.5860/lrts.52n1.4

T, B., & Ganeshan, H. (2021). SUPPLY CHAIN RISK IDENTIFICATION AND ASSESSMENT BY PROBABILITY & IMPACT MATRIX. International Journal Of Services And Operations Management, 1(1), 1. doi: 10.1504/ijsom.2021.10043419

A, A., Y, A., & I, V. (2019). Risk Assessment and Analysis of Healthcare System Using Probability-Impact Matrix. Nursing &Amp; Primary Care, 3(5). doi: 10.33425/2639-9474.1121

Carbone, T., & Tippett, D. (2004). Project Risk Management Using the Project Risk FMEA. Engineering Management Journal, 16(4), 28-35. doi: 10.1080/10429247.2004.11415263

Downloads

Published

2023-03-08

How to Cite

Qu, Y., & Sun, X. (2023). Risk Assessment Study of Academic Talent Data Management Platform Development Project. BCP Business & Management, 40, 24-32. https://doi.org/10.54691/bcpbm.v40i.4356