Application of Kano Model in Risk Identification of Software Development Projects

Authors

  • Yanchen Liu
  • Kai Ruan

DOI:

https://doi.org/10.54691/bcpbm.v40i.4357

Keywords:

KANO Model; Risk; Identification; Software Project

Abstract

Risk management and identification of software projects is an important factor in software project management. Software project risks will affect the implementation of the project plans, and if they do, they will affect the project progress, increase the project costs, and even make the software project unfeasible. Risk occurrence can be minimized if risk management and identification are implemented in a project. However, in China, many software development companies do not have the awareness of risk management and identification, or use inappropriate management technology, resulting in software development projects are often delayed, beyond the budget or even failed. Successful project management requires good risk management and identification of projects. This study adopts the Ko model to scientifically and reasonably determine the priority of risk management of software projects, and take corresponding countermeasures for different risk factors, to ensure the smooth implementation of software projects, and then ensure the  completion of them  and the realization of objectives. This ensures the successful completion of software projects and optimal management with limited resources.

Downloads

Download data is not yet available.

References

Yuan Yue, Hou Wenjun KANO model application research in the Internet user experience [j] software 2013,34 (4): 74-78

Wang Xue, Dong Xingqing, Zhang Bin, user demand analysis framework and empirical research for online reviews, —— is based on KANO model 10.16353/j.cnki 2022.02.021.1000-7490.

Wang Zhipeng, School of Fashion and Art and Design, Xi'an Engineering University, Sun Wei THE DESIGN OF INTERNET MEDICAL APP SERVICE SYSTEM BASED ON KANO MODEL

Mo Xiangqun Software Project Progress Risk Management [J] Computer and Information Technology 2002 (4): 19-20

Huang Meng's Software Project Risk Management Model based on user Requirements [J] Computer Engineering and Application 2003 (4) : 23-24

Risk management of Wen Yadong Software Project [J] Computer System Application 2002 (2): 25-26.

Fang Deying, Li Minqiang, Kou isong, Comparison and Analysis of software project risk management methods [J] Operations Research and Management, 2004 (6): 27-28

CAI Ling KANO Model in software Project Risk Management of Applied Research Master dissertation 2014.3

Huang Xunjiang, Hou Guangming. Evaluation Study on Risk Management Priority of Investment Projects [J].industrial technology economics.2005 (2): 107-109.

Chi Renyong.project management [M]. Beijing: Tsinghua University Press, 2004:4-5.

Li Jiamei. Empirical study on the effectiveness of aviation services based on the Kano model [D].[Master's dissertation]. Nanjing University of Aeronautics and Astronautics, 2009.

Luo Ronggui. A practical risk management approach for developing small software projects [J]. Journal of Wuhan University of Technology (Information and Management Engineering edition), 2003 (5): 16-17.

Mo Xiangqun. Progress Risk Management for software projects [J]. Computer and Information Technology, 2002 (4): 19-20.

Li Shaoming. The Project Risk Management Priority Evaluation Study [D].[Master's dissertation]. Southeastern University, 2006.

Shen Jianmin. Project Risk Management [M]. Beijing: Machinery Shanghai Industry Press, 2003.80.

Downloads

Published

2023-03-08