Risk Identification and Assessment of PPP Forestry Projects in China Using a Fuzzy Synthetic Evaluation Approach

Authors

  • Yimeng Ren
  • Zhifang Chen
  • Yahan Zhang

DOI:

https://doi.org/10.54691/bcpbm.v18i.573

Keywords:

Risk Identification, Risk Assessment, PPP, Fuzzy Synthetic Evaluation Approach

Abstract

At present, the Chinese government is vigorously promoting the use of PPP mode to attract social capital and financial capital into the field of forestry, including ecological construction, protection and utilization, which is of great significance for promoting the construction of ecological civilization and the development of both the economy and the society. Because the financing, organization, implementation and environmental factors of PPP forestry projects are relatively complicated, there are certain risks for both the government and social capital. In order to evaluate the risks of China's forestry projects for the government and social capital, 43 risk factors were identified and divided into 4 groups based on Delphi method and questionnaire survey. 23 key risk factors were selected according to the standardized values. Then, the probability of occurrence (PO), impact size (IS) and overall risk level (ORL) of each key factor were determined by fuzzy synthetic evaluation(FSE) method, and each KRF, KRG and overall risk level (ORL) were calculated. Based on the results, "Government Decision Risk" in KRF was the most critical risk factor, and KRG "Financial Risk" was the most critical risk factor group. Overall, fuzzy comprehensive results showed that the ORL of China's forestry PPP project is relatively high. According to the analysis results, countermeasures were put forward. The research results could provide reference for all participants in PPP forestry projects to make decisions, and formulate a comprehensive risk management plan to use limited resources. In addition, this study could expand professional knowledge and enrich relevant results.

Downloads

Download data is not yet available.

References

Almarri, K., Blackwell, P., 2014. Improving risk sharing and investment appraisal for PPP procurement success in large green projects. Procedia Soc. Behav. Sci., 119, 847-856. https://doi.org/10.1016/ j.sbspro. 2014.03.095.

Ameyaw, E. E., Chan, A. P., 2015. Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach. Expert Syst. Appl., 42(12), 5102-5116. https://doi.org/10.1016/j.eswa.2015.02.041.

Ameyaw, E. E., Chan, A. P., 2016. A fuzzy approach for the allocation of risks in public–private partnership water-infrastructure projects in developing countries. J. Infrastruct. Syst., 22(3), 04016016. https://doi.org/10.1061/ (ASCE)IS.1943-555X.0000297.

Ameyaw, E. E., Chan, A. P., Owusu-Manu, D. G., Edwards, D. J., Dartey, F., 2017. A Fuzzy-Based Evaluation of Financial Risks in Build–Own–Operate–Transfer Water Supply Projects. J. Infrastruct. Syst., 23(4), 04017033. https://doi.org/10.1061/ (ASCE)IS.1943-555X.0000390.

Bing, L., Akintoye, A., Edwards, P. J., Hardcastle, C., 2005. The allocation of risk in PPP/PFI construction projects in the UK. Int. J. Proj. Manag., 23(1), 25-35. https://doi.org/10.1016/j.ijproman.2004.04.006.

China Public Private Partnerships Center, 2014. Project Management Library of National PPP Comprehensive Information Platform. http://www.cpppc.org:8086/pppcentral/map/toPPPMap.do/ (accessed 13 July 2019).

Choi, J. H., Chung, J., Lee, D. J., 2010. Risk perception analysis: Participation in China’s water PPP market. Int. J. Proj. Manag., 28(6), 580-592. https://doi.org/10.1016/j.ijproman.2009.10.010.

Chou, J. S., Pramudawardhani, D., 2015. Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. Int. J. Project Manag., 33(5), 1136-1150. https://doi.org/10.1016/j.ijproman.2014.12.003.

He J., 2016. Risk Management of PPP Mode in Construction Waste Industry. Construction and Architecture, 2016(19). In Chinese.

Hu, Y., Chan, A. P., Le, Y., Xu, Y., Shan, M., 2016. Developing a program organization performance index for delivering construction megaprojects in China: fuzzy synthetic evaluation analysis. J. Manag. Eng., 32(4), 05016007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000432.

Institute of Datong Securities Asset Management, Ji Y., 2016. Empirical Analysis of Fuzzy Synthetic Evaluation of Enterprises’ Financial Risks. J. Invest. Manag., 5(6), 184-188. https://doi.org/10.11648/ j.jim. 20160506.22.

Jin, X. H., Zhang, G., 2011. Modelling optimal risk allocation in PPP projects using artificial neural networks. Int. J. Project Manag., 29(5), 591-603. https://doi.org/10.1016/j.ijproman.2010.07.011.

Keers, B. B., van Fenema, P. C., 2018. Managing risks in public-private partnership formation projects. Int. J. Project Manag., 36(6), 861-875. ttps://doi.org/10.1016/j.ijproman.2018.05.001.

Kumar, L., Jindal, A., Velaga, N. R., 2018. Financial risk assessment and modelling of PPP based Indian highway infrastructure projects. Transport Policy, 62, 2-11. https://doi.org/10.1016/j.tranpol.2017.03.010.

Li L., 2012. The risk assessment of BOT-TOT-PPP project financing based on risk matrix. J. Kunming Uni. Sci. Tech., 12(1), 74-79. In Chinese.

Li Q., Li X., 2017. Identification of critical success factors of PPP projects based on process analysis. J. Railway Sci. Eng., 14(2), 415-424. In Chinese.

Li, Y., 2017. Risk Sharing Mechanism of forest industry PPP investment and financing model: A Case Study for Hanzhong Forest Industry. J. Northwest A&F University. In Chinese.

Li, Y., Wang, X., Wang, Y., 2016. Using bargaining game theory for risk allocation of public-private partnership projects: Insights from different alternating offer sequences of participants. J. Constr. Eng. M., 143(3), 04016102. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001249.

Liao, Z., Liu, J., Luo, J., 2018. Survey of public-private partnerships. J. Financ. Econ. In Chinese.

Lin S., 2017. Financial management and risk control under PPP mode based on forestry projects. Modern Eco. Infor., 2017(19), 218-218. In Chinese.

Liu, J., Li, Q., Wang, Y., 2013. Risk analysis in ultra deep scientific drilling project-A fuzzy synthetic evaluation approach. Int. J. Project Manag., 31(3), 449-458. https://doi.org/10.1016/j.ijproman. 2012.09. 015.

National Forestry and Grassland Administration, 2018. China Forest Resources Report (2014—2018). http://www.forestry.gov.cn/main/447/20190617/152501323607074.html (accessed 13 July 2019).

Ng'Andwe, P., Chungu, D., Ratnasingam, J., Ramananantoandro, T., Donfack, P., Mwitwa, J., 2017. Forestry industry development in Zambia: an opportunity for public private partnership for small and medium enterprises. Int. Forest. Rev., 19(4), 467-477. https://doi.org/10.1505/1465548822272374.

Shrestha, A., Chan, T. K., Aibinu, A. A., Chen, C., 2017. Efficient risk transfer in PPP wastewater treatment projects. Util. policy, 48, 132-140. https://doi.org/10.1016/j.jup.2017.03.003.

Shrestha, A., Chan, T. K., Aibinu, A. A., Chen, C., Martek, I., 2017. Risks in PPP water projects in China: Perspective of local governments. J. Constr. Eng. M., 143(7), 05017006. https://doi.org/10.1061/ (ASCE)CO.1943-7862.0001313.

Shrestha, A., Chan, T. K., Aibinu, A. A., Chen, C., Martek, I., 2018. Risk allocation inefficiencies in Chinese PPP water projects. J. Constr. Eng. M., 144(4), 04018013. https://doi.org/10.1061/(ASCE) CO.1943-7862.0001457.

Shidpour, H., Da Cunha, C., Bernard, A., 2016. Group multi-criteria design concept evaluation using combined rough set theory and fuzzy set theory. Expert Syst. Appl., 64, 633-644. https://doi.org/10.1016/ j.eswa.2016.08.022.

Song J., Zhang L., 2013. Research on Information Security Risk Assessment Based on Triangular Fuzzy Entropy. Info. Studies Theory Appl., 36(8), 99-104. In Chinese.

Strand, J., Carson, R. T., Navrud, S., Ortiz-Bobea, A., Vincent, J. R., 2017. Using the Delphi method to value protection of the Amazon rainforest. Ecol. Econom., 131, 475-484. https://doi.org/10.1016/ j.ecolecon. 2016.09.028.

Widman, U., Bjärstig, T., 2017. Protecting forests’ social values through partnerships. Scandinavian J. Forest Res., 32(7), 633-644. https://doi.org/10.1080/02827581.2017.1342860.

Wu, Y., Li, L., Xu, R., Chen, K., Hu, Y., Lin, X., 2017. Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis. J. Clean Prod., 161, 977-990. https://doi.org/10.1016/j.jclepro.2017.06.008.

Wu, Y., Xu, C., Li, L., Wang, Y., Chen, K., Xu, R., 2018. A risk assessment framework of PPP waste-to-energy incineration projects in China under 2-dimension linguistic environment. J. Clean Prod., 183, 602-617. https://doi.org/10.1016/j.jclepro.2018.02.077.

Xu, Y., Yeung, J. F., Chan, A. P., Chan, D. W., Wang, S. Q., Ke, Y., 2010. Developing a risk assessment model for PPP projects in China—A fuzzy synthetic evaluation approach. Automat. Constr., 19(7), 929-943. https://doi.org/10.1016/j.autcon.2010.06.006.

Yang, Y., Zhou Z., Bai Y., Cai, Y., Chen, W., 2016. Risk assessment of heavy metal pollution in sediments of the Fenghe River by the fuzzy synthetic evaluation model and multivariate statistical methods. Pedosphere, 26(3), 326-334. https://doi.org/10.1016/S1002-0160 (15)60046-7.

Yi X., Jiang T., Qiu H., 2016. Dynamic Risk Allocation Mechanism of Public-Private Partnership Rail Transit Project Based on Hall’s Three Dimensional Structure. J. East China Jiaotong Uni., 33(6), 91-98. In Chinese.

Yuan, J., Xu, W., Xia, B., Skibniewski, M. J., 2017. Exploring key indicators of residual value risks in China’s public–private partnership projects. J. Manag. Eng., 34(1), 04017046. https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000561.

Zhang H., Ye S., 2016. Research on Risks and Pathways of PPP Projects’ Early-Termination. Sci. Tech. Manag. Res., 36(24):225-229. http://en.cnki.com.cn/Article_en/CJFDTotal-KJGL201624038.htm.

Zhang H., Yu S., 2017. Accelerating the Investment and Financing Mechanism Innovation & Promoting The Development of Forestry Industry. China Forest. Prod. Industry, 44(4), 3-5. In Chinese.

Zhang, L., Zhao, J., Zheng, Y., et al., 2017. Analysis and Suggestions on PPP Cooperation in Forestry. China Green Times. 2017-03-10. In Chinese.

Zhang, S., Chan, A. P., Feng, Y., Duan, H., Ke, Y., 2016. Critical review on PPP Research–A search from the Chinese and International Journals. Int. J. Project Manag., 34(4), 597-612. https://doi.org/10.1016/ j.ijproman. 2016.02.008.

Zhang, S., Gao, Y., Feng, Z., Sun, W., 2015. PPP application in infrastructure development in China: Institutional analysis and implications. Int. J. Project Manag., 33(3), 497-509. https://doi.org/ 10.1016/ j.ijproman.2014.06.006.

Zhang, X., 2005. Critical success factors for public–private partnerships in infrastructure development. J. Constr. Eng. M., 131(1), 3-14. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(3).

Downloads

Published

2022-04-13

How to Cite

Ren, Y., Chen, Z., & Zhang, Y. (2022). Risk Identification and Assessment of PPP Forestry Projects in China Using a Fuzzy Synthetic Evaluation Approach. BCP Business & Management, 18, 355-380. https://doi.org/10.54691/bcpbm.v18i.573