Research on Risk Management of Engineering Projects under EPC Mode

Authors

  • Genli Tang
  • Huajun Ding
  • Heng Zhang

DOI:

https://doi.org/10.54691/b7147g82

Keywords:

EPC; General Contracting Mode; Project Management; Risk Management.

Abstract

As a typical type of general contracting model, EPC (Engineering Procurement Construction) refers to the full process general contracting carried out by the contractor on behalf of the owner, in accordance with the agreement, for the design, procurement, construction and other stages of the engineering project. Compared to other modes, the EPC general contracting mode also faces more risk, with risk factors in each link. This article conducts research on the risk of engineering projects under the EPC mode, mainly analyzing the characteristics of the EPC mode and the risk problems existing in the EPC general contracting mode. It proposes relevant countermeasures to strengthen the risk management of EPC general contracting projects from four aspects: contract, design, procurement, and construction, providing a certain reference for the risk management of EPC projects in construction enterprises.

Downloads

Download data is not yet available.

References

Long Pang, Zehua Liu .EPC (Design, Procurement, and Construction General Contracting) Whole Process Risk Control Strategy [J]. Heilongjiang Transportation Technology2023 (10): 161-165.

Jianwang Xia.Procurement Risk Management of Engineering Projects under EPC General Contracting Mode [J]. Engineering Technology Research, 2020,5 (04): 198-199.

Huisheng Xu. Research on Contract Risk Analysis and Prevention of EPC Projects from the Perspective of Engineering General Contractors [D]. Tianjin University of Technology, 2016.

Jie Lin.Research on Contract Risk Management of General Contracting Projects under EPC Mode [D]. Central South University, 2012.

Lu Cen.Risk prevention and cost control of construction project cost under EPC mode [J]. China Tendering, 2023 (09): 166-168.